Dispatch Pro · Optional add-on

Plan delivery days against the trucks and drivers you actually have.

Dispatch Pro checks the order, equipment, driver schedule, qualifications, capacity, and time before turning delivery demand into a workable plan.

$1 per Dispatch Pro orderCounted once when you first save its delivery plan · replans and additional loads included
FlintPOS Dispatch Pro board with scheduled trucks and delivery orders.
Dispatch Pro delivery board

Before the board

A delivery date is a capacity promise.

A calendar can show an open square and still miss the truck, trailer, driver, material, or hours needed to fulfill the order. Dispatch Pro plans with the constraints that decide whether the delivery can leave the yard.

  • Truck and trailer weight and volume capacity
  • Driver qualifications, availability, and scheduled hours
  • Inventory location and product delivery requirements
  • Mapped no-delivery zones and destination surcharge areas
  • Drive time plus normal load and unload time
  • Existing orders already consuming the day’s capacity

One operational path

Move the order from sale to completed stop.

Dispatch Pro keeps the delivery tied to the FlintPOS order, so the dispatcher and driver work from the same product, customer, payment, and fulfillment details entered at the counter.

  1. 01Read the delivery order
  2. 02Check equipment and driver fit
  3. 03Reserve time and capacity
  4. 04Send the stop to the driver
  5. 05Return status and proof
FlintPOS truck time budget for a delivery schedule.

The constraint that gets missed

See time pressure before the route is overbooked.

Truck columns combine scheduled work with the day’s usable time. Dispatchers can see where another stop fits and where it creates risk before assigning the order.

Stronger together

Let Storefront sell only the delivery capacity Dispatch Pro can support.

When both add-ons are active, customers can browse products, choose an available delivery date, and pay online. Dispatch Pro checks inventory, equipment, drivers, and time before Storefront offers the date.

Storefront gainsLive delivery availability, scheduling holds, and online payment.
Dispatch Pro gainsOnline orders arrive with the product, address, payment, and requested delivery date already attached.

Use your real delivery day

See what Dispatch Pro would plan.

Bring your trucks, driver schedules, delivery areas, and a representative order to a working-yard walkthrough.